Please note: You are using an outdated version of Internet Explorer. Please update to IE10 here to properly experience the ATI website.

45.

European Investment Bank

Poor

45

OVERVIEW

The EIB is an international financial institution, owned by EU Member States. It cooperates with other EU institutions to implement EU policy and provides lending, blended support and technical advice to support investment implementation. It works increasingly with the European Commission and Member State development agencies in support of EU development and cooperation policies.

The EIB joined IATI in October 2013. It should be congratulated for beginning publication to the IATI Standard and for publishing its first implementation schedule in September 2014.[1] The EIB is a leading member of a working group that is developing specific guidance for IFIs on publishing to the IATI Standard. The EIB’s 2011 Transparency Policy includes a presumption of disclosure and it leads amongst other multilateral organisations on clarifying exceptions to disclosure. This policy was under review at the time of writing and while the proposed revisions include the commitment to implement IATI, they also significantly expand the list of items that fall under exceptions to disclosure. The EIB’s project database provides information both on activities financed as well as those submitted to the EIB for financing.

ANALYSIS

The EIB scores 24.6%, placing it in the poor category. It ranks 16th out of 17 multilateral organisations. The EIB is the only IFI not to publish the current status of its activities and country strategy papers consistently. Overall, it scores over 30 percentage points less than the average for EU institutions (56.7%). The EIB performs relatively well on organisation planning but does not score on performance information (results, conditions and impact appraisals) and scores on less than half the activity-level indicators. Of the 22 indicators that take format into account, four are published in machine-readable formats, and eight are published in other formats on the EIB website. Overall, it does not score on 17 of the 39 indicators.

RECOMMENDATIONS

  • The EIB should ensure that its IATI publication is high quality and comprehensive. It should aim to update its IATI files on at least a quarterly basis.
  • The EIB should continue to champion aid transparency within the IFI community and work with IATI to develop specific guidance for IFIs, sharing best practice on publishing to the IATI Standard.
  • It should use its IATI data in its programming and coordination processes and promote access to information by others, in the first instance via an open data portal.
  • The EIB should ensure that its revised Transparency Policy reflects best practice on presumption of disclosure, exceptions, public interest overrides and independent appeals processes. 

[1] Note: As data collection for the Index was 1st April to 30th June 2014, the EIB’s IATI publication could not be taken into account in 2014.

Close

DONOR PROFILE

First published to IATI:

N/A

2013 ATI Score:

26.64%

2013 ATI Rank:

33



Visit ATI 2013...

INDICATOR SCORING

TOTAL

24.58%


COMMITMENT TO
AID TRANSPARENCY:

4.44/10


PUBLICATION
ORGANISATION LEVEL:

8.47/25


PUBLICATION
ACTIVITY LEVEL:

11.66/65

Commitment

1. FOIA

2. Implementation Schedules

3. Accessibility

Publication Status
Source

http://www.eib.org/attachments/strategies/transparency_policy_en.pdf

Comments

Publish What You Fund completed an assessment of the quality of disclosure policies based on the overarching approach taken in the Global Right to Information Rating. A new methodology has been used for evaluating disclosure policies in 2014.


Click here to view history

1. FOIA

Stage

Status

Format

Source

Comments

Researcher
http://www.eib.org/attachments/strategies/transparency_policy_en.pdf
Publish What You Fund completed an assessment of the quality of disclosure policies based on the overarching approach taken in the Expand...Global Right to Information Rating.

Donor Review
http://www.eib.org/attachments/strategies/transparency_policy_en.pdf

PWYF Review

Independent Reviewer
Disagree
There will be a review of this transparency Policy in 2014, still elements are to be improved

PWYF Final Assessment
http://www.eib.org/attachments/strategies/transparency_policy_en.pdf
Publish What You Fund completed an assessment of the quality of disclosure policies based on the overarching approach taken in the Expand...Global Right to Information Rating. A new methodology has been used for evaluating disclosure policies in 2014.

Publication Status
Source

No data available.

Comments

No common standard or IATI implementation schedule found.


Click here to view history

2. Implementation schedules

Stage

Status

Format

Source

Comments

Researcher
No common standard or IATI implementation schedule found.

Donor Review

PWYF Review

Independent Reviewer
Disagree

PWYF Final Assessment
No common standard or IATI implementation schedule found.

Publication Status
Source

http://www.eib.org/projects

Comments

Portals are scored using three criteria: 1) the portal allows free, bulk export of data; 2) it contains detailed disaggregated data; 3) the data is published under an open licence. Each of these carry 1/3rd of the total points of 100.Scores for detailed, disaggregated data and free bulk export


Click here to view history

3. Accessibility

Stage

Status

Format

Source

Comments

Researcher
http://www.eib.org/projects
Portals are scored using three criteria: 1) the portal allows free, bulk export of data; 2) it contains detailed disaggregated data; Expand...3) the data is published under an open licence. Each of these carry 1/3rd of the total points of 100.Scores for detailed, disaggregated data and free bulk export

Donor Review
http://www.eib.org/projects

PWYF Review

Independent Reviewer
Disagree

PWYF Final Assessment
http://www.eib.org/projects
Portals are scored using three criteria: 1) the portal allows free, bulk export of data; 2) it contains detailed disaggregated data; Expand...3) the data is published under an open licence. Each of these carry 1/3rd of the total points of 100.Scores for detailed, disaggregated data and free bulk export

Planning

Financial

4. Organisation Strategy

5. Annual Report

6. Allocation Policy

7. Procurement Policy

8. Country Strategy

9. Total Budget

10. Disaggregated Budgets

11. Audit

Publication Status

Always

Format: Document

Source

http://www.eib.org/attachments/strategies/cop_2014_en.pdf

Comments

EIB operational plan 2014-2016 published. While the reviewer raises an important point about the process, as the strategy document is publicly available, the information is considered to be 'always published.'


Click here to view history

4. Organisation strategy

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://www.eib.org/attachments/strategies/cop_2014_en.pdf
EIB operational plan 2014-2016 published.

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree
Document
This document is public. However, secrecy remains about its preparation, but that does not fall within the scope of IATI

PWYF Final Assessment
Always
Document
http://www.eib.org/attachments/strategies/cop_2014_en.pdf
EIB operational plan 2014-2016 published. While the reviewer raises an important point about the process, as the strategy document is publicly Expand...available, the information is considered to be 'always published.'

Publication Status

Always

Format: Document

Source

http://www.eib.org/infocentre/publications/all/financial-report-2012.htm

Comments

Published within regular cycles.


Click here to view history

5. Annual report

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://www.eib.org/infocentre/publications/all/financial-report-2012.htm
The bank publishes an Activity Report, Statistical Report as well as a Financial Report. The last set of reports were published Expand...in April 2013. It appears that these are published within regular cycles.

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree
Document
Confirmed. In April 2014, the 2013 reports were also published, showing that this is well institutionalised.

PWYF Final Assessment
Always
Document
http://www.eib.org/infocentre/publications/all/financial-report-2012.htm
Published within regular cycles.

Publication Status

Always

Format: Document

Source

http://www.eib.org/attachments/strategies/cop_2014_en.pdf

Comments

The reviewer raises an important point about the level of detail available in some allocation areas. However, the information included in the operational plan is accepted in line with the requirements outlined in the scoring guidelines.


Click here to view history

6. Allocation policy

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://www.eib.org/attachments/strategies/cop_2014_en.pdf
The information is included in the operational plan.

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree
Document
There remain gaps in the allocation Policy of the EIB: Under its External Lending Mandate (mandate given by EU institutions to Expand...operate in most countries outside the EU), the EIB has been tasked to publish an allocation Policy explaining how they define which projects outside of the EU receive EU guarantee, and which projects don't. This hasn't been done yet.

PWYF Final Assessment
Always
Document
http://www.eib.org/attachments/strategies/cop_2014_en.pdf
The reviewer raises an important point about the level of detail available in some allocation areas. However, the information included in Expand...the operational plan is accepted in line with the requirements outlined in the scoring guidelines.

Publication Status

Always

Format: Document

Source

http://www.eib.org/infocentre/publications/all/guide-for-procurement-of-services-supplies-and-works-by-the-eib-for-its-own-account.htm http://www.eib.org/attachments/thematic/guide_procurement_services_en.pdf

Comments

Guide for procurement of services, supplies and works procured by the EIB for its own account is published.


Click here to view history

7. Procurement policy

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://www.eib.org/infocentre/publications/all/guide-for-procurement-of-services-supplies-and-works-by-the-eib-for-its-own-account.htm http://www.eib.org/attachments/thematic/guide_procurement_services_en.pdf
Guide for procurement of services, supplies and works procured by the EIB for its own account is published.

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree
Document

PWYF Final Assessment
Always
Document
http://www.eib.org/infocentre/publications/all/guide-for-procurement-of-services-supplies-and-works-by-the-eib-for-its-own-account.htm http://www.eib.org/attachments/thematic/guide_procurement_services_en.pdf
Guide for procurement of services, supplies and works procured by the EIB for its own account is published.

Publication Status

Sometimes

Format: Document

Source

http://www.eib.org/infocentre/search.htm?keywords=framework+agreement

Comments

Based on reviewer comments and the evidence provided alongside, it appears that EIB does have country framework agreements. However these do not appear to be published. As mid-level documents are published, this information is considered to be 'sometimes published.'


Click here to view history

8. Country strategy

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://www.eib.org/projects/priorities/index.htm http://www.eib.org/attachments/strategies/cop_2014_en.pdf
Strategy for 6 priority areas are described in the operational plan document. More information is available on the website under 'priorities'. Expand...For IFIs mid-level documents between organisation and activity level are accepted, e.g. thematic or sectoral level documents. Hence scored 'always' published.

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree
Document
But Framework agreements with beneficiary countries are not disclosed on EIB website; only accessible upon request.

PWYF Final Assessment
Sometimes
Document
http://www.eib.org/infocentre/search.htm?keywords=framework+agreement
Based on reviewer comments and the evidence provided alongside, it appears that EIB does have country framework agreements. However these do Expand...not appear to be published. As mid-level documents are published, this information is considered to be 'sometimes published.'

Publication Status
Source

http://www.eib.org/attachments/strategies/cop_2014_en.pdf

Comments

Rolling 3-year Operational Plan is published every year, and indicates the envisaged financing volumes and the high-level operational priorities applicable to financing activities in the Neighbourhood and Partner countries. The current plan runs up to 2016.


Click here to view history

9. Total budget

Stage

Status

Format

Source

Comments

Researcher
Pdf
http://www.eib.org/attachments/strategies/cop_2014_en.pdf
Rolling 3-year Operational Plan is published every year, and indicates the envisaged financing volumes and the high-level operational priorities applicable to Expand...financing activities in the Neighbourhood and Partner countries. The current plan runs up to 2016.

Donor Review
Pdf

PWYF Review
Pdf

Independent Reviewer
Disagree

PWYF Final Assessment
Pdf
http://www.eib.org/attachments/strategies/cop_2014_en.pdf
Rolling 3-year Operational Plan is published every year, and indicates the envisaged financing volumes and the high-level operational priorities applicable to Expand...financing activities in the Neighbourhood and Partner countries. The current plan runs up to 2016.

Publication Status
Source

http://www.eib.org/attachments/strategies/cop_2014_en.pdf

Comments

Disaggregated budgets upto 2016 available for public policy objectives inside EU and pre-accession countries (which includes Turkey


Click here to view history

10. Disaggregated budgets

Stage

Status

Format

Source

Comments

Researcher
Pdf
http://www.eib.org/attachments/strategies/cop_2014_en.pdf
Disaggregated budgets upto 2016 available for public policy objectives inside EU and pre-accession countries (which includes Turkey

Donor Review
Pdf

PWYF Review
Pdf

Independent Reviewer
Disagree

PWYF Final Assessment
Pdf
http://www.eib.org/attachments/strategies/cop_2014_en.pdf
Disaggregated budgets upto 2016 available for public policy objectives inside EU and pre-accession countries (which includes Turkey

Publication Status

Always

Format: Document

Source

http://www.eib.org/attachments/general/reports/fr2012en.pdf

Comments

Independent auditor report and audited financial statements are available as part of the Annual Financial Report.


Click here to view history

11. Audit

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://www.eib.org/attachments/general/reports/fr2012en.pdf
Independent auditor report and audited financial statements are available as part of the Annual Financial Report.

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree
Document

PWYF Final Assessment
Always
Document
http://www.eib.org/attachments/general/reports/fr2012en.pdf
Independent auditor report and audited financial statements are available as part of the Annual Financial Report.

Basic

Classifications

Financial

Performance

12. Implementer

13. Unique ID

14. Title

15. Description

16. Planned Dates

17. Actual Dates

18. Current Status

19. Contact Details

20. Collaboration Type

21. Flow Type

22. Aid Type

23. Finance Type

24. Sector

25. Sub-national Location

26. Tied Aid Status

33. Budget

34. Commitments

35. Disbursements And Expenditure

36. Budget Identifier

37. Results

38. Impact Appraisals

39. Conditions

Publication Status

Always

Format: Website

Source

http://www.eib.org/projects/pipeline/2011/20110171.htm

Comments

The name of the promoter or financial intermediary is published in the project summary sheets. Although the reviewer raises an important point, this indicator does not assess who the final beneficiaries of support are.


Click here to view history

12. Implementer

Stage

Status

Format

Source

Comments

Researcher
Always
Website
http://www.eib.org/projects/pipeline/2011/20110171.htm
The name of the promoter or financial intermediary is published in the project summary sheets.

Donor Review
Always
Website

PWYF Review
Always
Website

Independent Reviewer
Disagree
In the case of Financial intermediaries, the name is published, but very limited information is available, and none about the final Expand...beneficiaries of EIB support.

PWYF Final Assessment
Always
Website
http://www.eib.org/projects/pipeline/2011/20110171.htm
The name of the promoter or financial intermediary is published in the project summary sheets. Although the reviewer raises an important Expand...point, this indicator does not assess who the final beneficiaries of support are.

Publication Status

Always

Format: Website

Source

http://www.eib.org/projects/pipeline/2011/20110171.htm

Comments

Unique project reference/ID is stated for each project in the project database. It can be found right below the project title (""reference"")


Click here to view history

13. Unique ID

Stage

Status

Format

Source

Comments

Researcher
Always
Website
http://www.eib.org/projects/pipeline/2011/20110171.htm
Unique project reference/ID is stated for each project in the project database. It can be found right below the project title Expand...(""reference"")

Donor Review
Always
Website

PWYF Review
Always
Website

Independent Reviewer
Disagree

PWYF Final Assessment
Always
Website
http://www.eib.org/projects/pipeline/2011/20110171.htm
Unique project reference/ID is stated for each project in the project database. It can be found right below the project title Expand...(""reference"")

Publication Status

Always

Format: Machine-readable

Source

http://www.eib.org/projects/pipeline/2012/20120532.htm http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or=

Comments

Available through the project database in machine-readable format.


Click here to view history

14. Title

Stage

Status

Format

Source

Comments

Researcher
Always
Machine readable
http://www.eib.org/projects/pipeline/2012/20120532.htm http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or= Expand...
Available through the project database in machine-readable format.

Donor Review
Always
Machine readable

PWYF Review
Always
Machine readable

Independent Reviewer
Disagree

PWYF Final Assessment
Always
Machine readable
http://www.eib.org/projects/pipeline/2012/20120532.htm http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or= Expand...
Available through the project database in machine-readable format.

Publication Status

Always

Format: Website

Source

http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or= http://www.eib.org/projects/pipeline/2013/20130145.htm

Comments

Short description are sometimes available in machine-readable format, but always in project data sheets/documents.


Click here to view history

15. Description

Stage

Status

Format

Source

Comments

Researcher
Always
Website
http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or= http://www.eib.org/projects/pipeline/2013/20130145.htm Expand...
Short description are sometimes available in machine-readable format, but always in project data sheets/documents.

Donor Review
Always
Website

PWYF Review
Always
Website

Independent Reviewer
Disagree

PWYF Final Assessment
Always
Website
http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or= http://www.eib.org/projects/pipeline/2013/20130145.htm Expand...
Short description are sometimes available in machine-readable format, but always in project data sheets/documents.

Publication Status

Sometimes

Format: Machine-readable

Source

http://www.eib.org/projects/loans/2011/20110171.htm http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or=

Comments

Start or signature dates are available, but no planned end dates appear to be provided


Click here to view history

16. Planned dates

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Machine readable
http://www.eib.org/projects/loans/2011/20110171.htm http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or= Expand...
Start or signature dates are available, but no planned end dates appear to be provided

Donor Review
Sometimes
Machine readable

PWYF Review
Sometimes
Machine readable

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Machine readable
http://www.eib.org/projects/loans/2011/20110171.htm http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or= Expand...
Start or signature dates are available, but no planned end dates appear to be provided

Publication Status

Sometimes

Format: Machine-readable

Source

http://www.eib.org/projects/loans/2011/20110171.htm http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or=

Comments

Both start and end dates are required to score on this indicator. The initial signing date is available for all projects. EIB does not have any projects listed as complete or finished.


Click here to view history

17. Actual dates

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Machine readable
http://www.eib.org/projects/loans/2011/20110171.htm http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or= Expand...
Both start and end dates are required to score on this indicator. The initial signing date is available for all projects. Expand...EIB does not have any projects listed as complete or finished.

Donor Review
Sometimes
Machine readable

PWYF Review
Sometimes
Machine readable

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Machine readable
http://www.eib.org/projects/loans/2011/20110171.htm http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or= Expand...
Both start and end dates are required to score on this indicator. The initial signing date is available for all projects. Expand...EIB does not have any projects listed as complete or finished.

Publication Status

Sometimes

Format: Website

Source

http://www.eib.org/projects

Comments

No completed projects are listed on the project database. Hence the information on current status is considered to be 'sometimes published.'


Click here to view history

18. Current Status

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Website
http://www.eib.org/projects
No completed projects are listed on the project database. Hence the information on current status is considered to be 'sometimes published.' Expand...

Donor Review
Sometimes
Website

PWYF Review
Sometimes
Website

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Website
http://www.eib.org/projects
No completed projects are listed on the project database. Hence the information on current status is considered to be 'sometimes published.' Expand...

Publication Status

Always

Format: Website

Source

http://www.eib.org/projects/pipeline/2013/20130145.htm

Comments

Generic contact details provided at the top of the 'Projects to be Financed' page. The same link appears on each project profile page. This is accepted in line with the scoring methodology. However, as suggested by the independent reviewer, project specific contact details would be more desirable.


Click here to view history

19. Contact details

Stage

Status

Format

Source

Comments

Researcher
Always
Website
http://www.eib.org/projects/pipeline/2013/20130145.htm
Generic contact details provided at the top of the 'Projects to be Financed' page. The same link appears on each project Expand...profile page.

Donor Review
Always
Website

PWYF Review
Always
Website

Independent Reviewer
Disagree
The contact détails could be much more specific and tailored indeed.

PWYF Final Assessment
Always
Website
http://www.eib.org/projects/pipeline/2013/20130145.htm
Generic contact details provided at the top of the 'Projects to be Financed' page. The same link appears on each project Expand...profile page. This is accepted in line with the scoring methodology. However, as suggested by the independent reviewer, project specific contact details would be more desirable.

Publication Status

Not Published

Source

http://www.eib.org/projects/pipeline/2013/20130145.htm

Comments

This information could not be found. If a single collaboration type applies to all projects, it must be explicitly stated on the website.


Click here to view history

20. Collaboration Type

Stage

Status

Format

Source

Comments

Researcher
Not published
http://www.eib.org/projects/pipeline/2013/20130145.htm
This information could not be found. If a single collaboration type applies to all projects, it must be explicitly stated on Expand...the website.

Donor Review
Not published

PWYF Review
Not published

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
http://www.eib.org/projects/pipeline/2013/20130145.htm
This information could not be found. If a single collaboration type applies to all projects, it must be explicitly stated on Expand...the website.

Publication Status

Not Published

Source

http://www.eib.org/projects/pipeline/2013/20130145.htm

Comments

This information could not be found. If a single flow type applies to all projects, it must be explicitly stated on the website.


Click here to view history

21. Flow Type

Stage

Status

Format

Source

Comments

Researcher
Not published
http://www.eib.org/projects/pipeline/2013/20130145.htm
This information could not be found. If a single flow type applies to all projects, it must be explicitly stated on Expand...the website.

Donor Review
Not published

PWYF Review
Not published

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
http://www.eib.org/projects/pipeline/2013/20130145.htm
This information could not be found. If a single flow type applies to all projects, it must be explicitly stated on Expand...the website.

Publication Status

Always

Format: Website

Source

http://www.eib.org/about/index.htm

Comments

All EIB activities are project-type interventions.


Click here to view history

22. Aid Type

Stage

Status

Format

Source

Comments

Researcher
Always
Website
http://www.eib.org/about/index.htm
All EIB activities are project-type interventions.

Donor Review
Always
Website

PWYF Review
Always
Website

Independent Reviewer
Disagree

PWYF Final Assessment
Always
Website
http://www.eib.org/about/index.htm
All EIB activities are project-type interventions.

Publication Status

Always

Format: Website

Source

http://www.eib.org/projects/pipeline/2013/20130145.htm

Comments

While the reviewer raises an important point about additional detail related to this information, finance type - loan/credit line etc appear to be published.


Click here to view history

23. Finance Type

Stage

Status

Format

Source

Comments

Researcher
Always
Website
http://www.eib.org/projects/pipeline/2013/20130145.htm
The information is published in the project data sheets.

Donor Review
Always
Website

PWYF Review
Always
Website

Independent Reviewer
Disagree
Gaps remain: for instance, guarantees are not always indicated as such.

PWYF Final Assessment
Always
Website
http://www.eib.org/projects/pipeline/2013/20130145.htm
While the reviewer raises an important point about additional detail related to this information, finance type - loan/credit line etc appear Expand...to be published.

Publication Status

Always

Format: Machine-readable

Source

http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or=

Comments

Available through the project database in machine-readable format.


Click here to view history

24. Sector

Stage

Status

Format

Source

Comments

Researcher
Always
Machine readable
http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or=
Available through the project database in machine-readable format.

Donor Review
Always
Machine readable

PWYF Review
Always
Machine readable

Independent Reviewer
Disagree

PWYF Final Assessment
Always
Machine readable
http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or=
Available through the project database in machine-readable format.

Publication Status

Sometimes

Format: Website

Source

http://www.eib.org/projects/pipeline/2011/20110171.htm http://www.eib.org/projects/pipeline/2012/20120401.htm

Comments

Please see links alongside. One project provides the exact sub national location - Ankara, but the other does not. This information is therefore considered sometimes published.


Click here to view history

25. Sub-national location

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Website
http://www.eib.org/projects/pipeline/2011/20110171.htm http://www.eib.org/projects/pipeline/2012/20120401.htm
See alongside. One project provides the exact location - Ankara. The other does not.

Donor Review
Sometimes
Website

PWYF Review
Sometimes
Website

Independent Reviewer
Disagree
This is not systematised in the description of projects.

PWYF Final Assessment
Sometimes
Website
http://www.eib.org/projects/pipeline/2011/20110171.htm http://www.eib.org/projects/pipeline/2012/20120401.htm
Please see links alongside. One project provides the exact sub national location - Ankara, but the other does not. This information Expand...is therefore considered sometimes published.

Publication Status

Not Published

Source

http://www.eib.org/infocentre/publications/all/guide-to-procurement.htm

Comments

Tied-aid status for individual projects is not available. Based on the procurement guidelines, eligibility restrictions are applicable for certain types of financing arrangements. This being the case, tied aid status needs to be specified for each activity (See page 36 and 37).


Click here to view history

26. Tied Aid Status

Stage

Status

Format

Source

Comments

Researcher
Not published
http://www.eib.org/infocentre/publications/all/guide-to-procurement.htm
Tied-aid status for individual projects is not available. Based on the procurement guidelines, eligibility restrictions are applicable for certain types of Expand...financing arrangements. This being the case, tied aid status needs to be specified for each activity (See page 36 and 37).

Donor Review
Not published

PWYF Review
Not published

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
http://www.eib.org/infocentre/publications/all/guide-to-procurement.htm
Tied-aid status for individual projects is not available. Based on the procurement guidelines, eligibility restrictions are applicable for certain types of Expand...financing arrangements. This being the case, tied aid status needs to be specified for each activity (See page 36 and 37).

Publication Status

Not Published

Source

No data available.

Comments

No signed MOU at the country level or agreements at the project level could be found.


Click here to view history

27. MoU

Stage

Status

Format

Source

Comments

Researcher
Not published
Document
No signed MOU at the country level or agreements at the project level could be found.

Donor Review
Not published
Document

PWYF Review
Not published
Document

Independent Reviewer
Disagree
Document

PWYF Final Assessment
Not published
Document
No signed MOU at the country level or agreements at the project level could be found.

Publication Status

Sometimes

Format: Document

Source

http://www.eib.org/projects/evaluation/reports/operations/index.htm

Comments

Evaluations appear to be published, but it is unclear whether this is a comprehensive listing of all evaluations conducted.


Click here to view history

28. Evaluations

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Document
http://www.eib.org/projects/evaluation/reports/operations/index.htm
Evaluations appear to be published, but it is unclear whether this is a comprehensive listing of all evaluations conducted.

Donor Review
Sometimes
Document

PWYF Review
Sometimes
Document

Independent Reviewer
Disagree
Document
At the time being; a result measurement Framework for activities outside the EU and a 3pillars assessment Framework for Inside the Expand...EU are being set and should improve the evaluation system, but it still has to deliver. The evaluation of projects at the time being is rather incomplete.

PWYF Final Assessment
Sometimes
Document
http://www.eib.org/projects/evaluation/reports/operations/index.htm
Evaluations appear to be published, but it is unclear whether this is a comprehensive listing of all evaluations conducted.

Publication Status

Always

Format: Document

Source

http://www.eib.org/projects/pipeline/2012/20120480.htm

Comments

Brief objectives are published.


Click here to view history

29. Objectives

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://www.eib.org/projects/pipeline/2012/20120480.htm
Brief objectives are published.

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree
Document

PWYF Final Assessment
Always
Document
http://www.eib.org/projects/pipeline/2012/20120480.htm
Brief objectives are published.

Publication Status

Not Published

Source

http://www.eib.org/projects/pipeline/2012/20120480.htm http://www.eib.org/projects/loans/2012/20120311.htm

Comments

No specific budget detailing what the intended spending is for the different lines of the individual activity could be found. For organisations where budget documents might be considered commercially sensitive, documents with redactions of the commercially sensitive pieces of information are accepted but the specific reasons for the redactions need to be explicitly stated in detail and must clarify why the information is commercially sensitive and would cause material and direct harm if published.


Click here to view history

30. Budget Docs

Stage

Status

Format

Source

Comments

Researcher
Not published
Document
http://www.eib.org/projects/pipeline/2012/20120480.htm http://www.eib.org/projects/loans/2012/20120311.htm
No specific budget detailing what the intended spending is for the different lines of the individual activity could be found. For Expand...organisations where budget documents might be considered commercially sensitive, documents with redactions of the commercially sensitive pieces of information are accepted but the specific reasons for the redactions need to be explicitly stated in detail and must clarify why the information is commercially sensitive and would cause material and direct harm if published.

Donor Review
Not published
Document

PWYF Review
Not published
Document

Independent Reviewer
Disagree
Document

PWYF Final Assessment
Not published
Document
http://www.eib.org/projects/pipeline/2012/20120480.htm http://www.eib.org/projects/loans/2012/20120311.htm
No specific budget detailing what the intended spending is for the different lines of the individual activity could be found. For Expand...organisations where budget documents might be considered commercially sensitive, documents with redactions of the commercially sensitive pieces of information are accepted but the specific reasons for the redactions need to be explicitly stated in detail and must clarify why the information is commercially sensitive and would cause material and direct harm if published.

Publication Status

Always

Format: Document

Source

http://www.eib.org/about/procurement/calls/hl-1103.htm http://ted.europa.eu/udl?uri=TED:NOTICE:405246-2013:TEXT:EN:HTML

Comments

Summary information on contracts awarded are published through the EIB procurement site.


Click here to view history

31. Contracts

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://www.eib.org/about/procurement/calls/hl-1103.htm http://ted.europa.eu/udl?uri=TED:NOTICE:405246-2013:TEXT:EN:HTML
Summary information on contracts awarded are published through the EIB procurement site.

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree
Document

PWYF Final Assessment
Always
Document
http://www.eib.org/about/procurement/calls/hl-1103.htm http://ted.europa.eu/udl?uri=TED:NOTICE:405246-2013:TEXT:EN:HTML
Summary information on contracts awarded are published through the EIB procurement site.

Publication Status

Always

Format: Document

Source

http://www.eib.org/about/procurement/index.htm

Comments

Tenders are available through the EIB procurement site.


Click here to view history

32. Tenders

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://www.eib.org/about/procurement/index.htm
Tenders are available through the EIB procurement site.

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree
Document

PWYF Final Assessment
Always
Document
http://www.eib.org/about/procurement/index.htm
Tenders are available through the EIB procurement site.

Publication Status

Always

Format: Machine-readable

Source

http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or=

Comments

Total estimated cost accepted for IFIs as per the requirements listed in the scoring guidelines.


Click here to view history

33. Budget

Stage

Status

Format

Source

Comments

Researcher
Not published
Annual breakdown of the overall activity budget could not be found. No forward-looking activity budget data is available for ongoing projects.

Donor Review
Not published

PWYF Review
Always
Machine readable
http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or=
Total estimated cost accepted for IFIs as per the requirements listed in the scoring guidelines.

Independent Reviewer
Disagree

PWYF Final Assessment
Always
Machine readable
http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or=
Total estimated cost accepted for IFIs as per the requirements listed in the scoring guidelines.

Publication Status

Always

Format: Machine-readable

Source

http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or=

Comments

Available in machine-readable format.


Click here to view history

34. Commitments

Stage

Status

Format

Source

Comments

Researcher
Always
Machine readable
http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or=
Available in machine-readable format.

Donor Review
Always
Machine readable

PWYF Review
Always
Machine readable

Independent Reviewer
Disagree

PWYF Final Assessment
Always
Machine readable
http://www.eib.org/projects/loans/list/index.htm?start=2012&end=2014®ion=&country=turkey§or=
Available in machine-readable format.

Publication Status

Not Published

Source

No data available.

Comments

Response corrected to 'not published'. Review of the evidence suggests that actual disbursements and expenditures are not published. While such information might be considered to be commercially sensitive by some organisations, actual expenditure information is less sensitive once the money has been spent. Hence all organisations are scored on this indicator. For IFIs and DFIs, the total fund/loan amount is accepted and details of the loan repayment costs and related charges can be redacted. The specific reasons for the redactions need to be explicitly stated in detail and must clarify why the information is commercially sensitive and would cause material and direct harm if published.


Click here to view history

35. Disbursements and expenditure

Stage

Status

Format

Source

Comments

Researcher
Always
Website
http://www.eib.org/projects/loans/2011/20110195.htm
Signature dates for loans available.

Donor Review
Always
Website

PWYF Review
Always
Website

Independent Reviewer
Disagree
In the case of Financial intermediaries, the signature of the loan does not mean that the money is ultimately spent to Expand...final beneficiaries. We've worked on cases where money flows are stuck, and this is nowhere indicated.

PWYF Final Assessment
Not published
Website
Response corrected to 'not published'. Review of the evidence suggests that actual disbursements and expenditures are not published. While such information Expand...might be considered to be commercially sensitive by some organisations, actual expenditure information is less sensitive once the money has been spent. Hence all organisations are scored on this indicator. For IFIs and DFIs, the total fund/loan amount is accepted and details of the loan repayment costs and related charges can be redacted. The specific reasons for the redactions need to be explicitly stated in detail and must clarify why the information is commercially sensitive and would cause material and direct harm if published.

Publication Status

Not Published

Source

No data available.

Comments

This information could not be found.


Click here to view history

36. Budget Identifier

Stage

Status

Format

Source

Comments

Researcher
Not published
This information could not be found.

Donor Review
Not published

PWYF Review
Not published

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
This information could not be found.

Publication Status

Not Published

Source

No data available.

Comments

No results information available for the projects assessed.


Click here to view history

37. Results

Stage

Status

Format

Source

Comments

Researcher
Not published
No results information available for the projects assessed.

Donor Review
Not published

PWYF Review
Not published

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
No results information available for the projects assessed.

Publication Status

Sometimes

Format: Document

Source

http://www.eib.org/projects/pipeline/2012/20120480.htm http://www.eib.org/projects/loans/2012/20120663.htm

Comments

In case where an Environmental Impact Assessment (EIA) is required, the EIA is published. However impact appraisals are not published for all activities.


Click here to view history

38. Impact Appraisals

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Document
http://www.eib.org/projects/pipeline/2012/20120480.htm http://www.eib.org/projects/loans/2012/20120663.htm
In case where an Environmental Impact Assessment (EIA) is required, the EIA is published. However impact appraisals are not published for Expand...all activities.

Donor Review
Sometimes
Document

PWYF Review
Sometimes
Document

Independent Reviewer
Disagree
Document

PWYF Final Assessment
Sometimes
Document
http://www.eib.org/projects/pipeline/2012/20120480.htm http://www.eib.org/projects/loans/2012/20120663.htm
In case where an Environmental Impact Assessment (EIA) is required, the EIA is published. However impact appraisals are not published for Expand...all activities.

Publication Status

Sometimes

Format: Document

Source

http://www.eib.org/projects/pipeline/2012/20120663.htm

Comments

Conditions linked to specific activities is not published consistently. Terms and conditions such as those that might be included in or result from environment impact assessments are not consistently published for all activities.


Click here to view history

39. Conditions

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Document
http://www.eib.org/projects/pipeline/2012/20120663.htm
Conditions linked to specific activities is not published consistently. Terms and conditions such as those that might be included in or Expand...result from environment impact assessments are not consistently published for all activities.

Donor Review
Sometimes
Document

PWYF Review
Sometimes
Document

Independent Reviewer
Disagree
Document

PWYF Final Assessment
Sometimes
Document
http://www.eib.org/projects/pipeline/2012/20120663.htm
Conditions linked to specific activities is not published consistently. Terms and conditions such as those that might be included in or Expand...result from environment impact assessments are not consistently published for all activities.