15.

DG Enlargement

Good

OVERVIEW

DG Enlargement is responsible for managing and assisting the process whereby countries join the EU. Within the context of the new Multiannual Financial Framework (2014–2020) DG Enlargement manages the new Instrument for Pre-accession assistance (IPA II), often working together with International Financial Institutions such as the EIB and EBRD on investment projects in the region and also directly with pre-accession governments whereby management of EC funding is delegated to the beneficiary country. At the time of writing, the new EC President is proposing reallocating responsibility of the European Neighbourhood Instrument (ENI) covering the EC’s activities in its 16 neighbouring countries and previously the responsibility of DG DEVCO to DG Enlargement. See EC-wide commitments and recommendations.

DG Enlargement began publishing to IATI in July 2013. It updates its IATI files on a monthly basis. It has an ambitious common standard implementation schedule, with plans to publish 77% of the assessed IATI fields by the end of 2015. This includes several added-value fields, including project documents, conditions and sub-national location which are scheduled for publication later this year. However, the schedule does not specify timelines for publishing results data.

ANALYSIS

DG Enlargement scores 61.8%, placing it in the good category. It ranks 11th out of 17 multilateral organisations and has made good progress in several areas in 2014, with an increase of over 13 percentage points since the 2013 ATI. Its improvement in performance can be attributed to the publication of new information fields in IATI, including forward-looking organisation budgets, audit, activity dates, contact details and tied aid status, and its new open data portal. DG Enlargement performs well on organisation planning documents, activity classifications and basic information but does poorly on the provision of activity-level documents and performance information (results, conditions and impact appraisals), particularly the latter for which it does not score any points. DG Enlargement trails the other EC departments on organisation financial information. It is the only department to not score on disaggregated budget and one of two (the other is ECHO) to not score on sub-national location and forward-looking activity budgets. It scores on 29 of the 39 indicators included in the Index. Of the 22 indicators that take format into account, 17 are published in machine-readable formats.

RECOMMENDATIONS

  • DG Enlargement should improve its publication to IATI so it is comprehensive and includes links to project documents, results and conditions data.
  • It should require the publication to IATI by International Financial Institutions co-financing activities in the region with Instrument for Pre-accession Assistance funds and promote aid transparency and open data among the EU’s pre-accession countries.
  • DG Enlargement should use IATI data in programming and coordination processes and promote the access and use of this information by others.

Close

DONOR PROFILE

First published to IATI:

Jul-13

2013 ATI Score:

48.08%

2013 ATI Rank:

17



Visit ATI 2013...

INDICATOR SCORING

TOTAL

61.77%


COMMITMENT TO
AID TRANSPARENCY:

9.22/10


PUBLICATION
ORGANISATION LEVEL:

19.59/25


PUBLICATION
ACTIVITY LEVEL:

32.95/65

Commitment

1. FOIA

2. Implementation Schedules

3. Accessibility

Publication Status
Source

http://www.rti-rating.org/international.php

Comments

Total Global RTI rating score of 101. Score conversion from total score on Global RTI rating to Index points done using the following scale: 1 - 60: 33 61- 90: 66 91 - 150: 100


Click here to view history

1. FOIA

Stage

Status

Format

Source

Comments

Researcher
http://www.rti-rating.org/international.php
Total Global RTI rating score of 101. Score conversion from total score on Global RTI rating to Index points done using Expand...the following scale: 1 - 60: 33 61- 90: 66 91 - 150: 100

Donor Review
http://www.rti-rating.org/international.php

PWYF Review

Independent Reviewer
Disagree
http://www.rti-rating.org/international.php

PWYF Final Assessment
http://www.rti-rating.org/international.php
Total Global RTI rating score of 101. Score conversion from total score on Global RTI rating to Index points done using Expand...the following scale: 1 - 60: 33 61- 90: 66 91 - 150: 100

Donor Comments

Publication Status
Source

http://tracker.publishwhatyoufund.org/plan/organisations/

Comments

Based on Publish What You Fund's analysis of Common Standard/IATI implementation schedules.


Click here to view history

2. Implementation schedules

Stage

Status

Format

Source

Comments

Researcher
http://tracker.publishwhatyoufund.org/plan/organisations/
http://tracker.publishwhatyoufund.org/plan/organisations/

Donor Review
http://tracker.publishwhatyoufund.org/plan/organisations/

PWYF Review

Independent Reviewer
Disagree
http://tracker.publishwhatyoufund.org/plan/organisations/

PWYF Final Assessment
http://tracker.publishwhatyoufund.org/plan/organisations/
Based on Publish What You Fund's analysis of Common Standard/IATI implementation schedules.

Donor Comments

Publication Status
Source

https://tr-aid.jrc.ec.europa.eu/SearchPageAction.do

Comments

The EU Aid explorer meets all three criteria for this indicator. At the time of conducting this review, ELARG's data was also available via this portal.


Click here to view history

3. Accessibility

Stage

Status

Format

Source

Comments

Researcher
https://tr-aid.jrc.ec.europa.eu/SearchPageAction.do
The EU Aid explorer scores for providing detailed, disaggregated data. However, free bulk export of the data is not possible and Expand...it is not clear whether the information is published under an open licence.

Donor Review
https://tr-aid.jrc.ec.europa.eu/SearchPageAction.do
An ""open licence"" statement is included on the EU Aid explorer webpage. It will be re-stated in the FAQ page to Expand...clarify that data is published under an open licence. Export function will be looked at by end of June at the latest.

PWYF Review
https://tr-aid.jrc.ec.europa.eu/SearchPageAction.do
The score has been amended to take licencing information into account.

Independent Reviewer
Disagree
This should be checked further, since if you run through the project search, no project under IPA funds could not fund Expand...(or the search function does not seem to be functioning). E.g if trying Serbia, 2013, Government and Civil Society, there is no results. Also if you try other IPA funds countries no result appears.

PWYF Final Assessment
https://tr-aid.jrc.ec.europa.eu/SearchPageAction.do
The EU Aid explorer meets all three criteria for this indicator. At the time of conducting this review, ELARG's data was Expand...also available via this portal.

Donor Comments

Planning

Financial

4. Organisation Strategy

5. Annual Report

6. Allocation Policy

7. Procurement Policy

8. Country Strategy

9. Total Budget

10. Disaggregated Budgets

11. Audit

Publication Status

IATI

Data quality: 100%


Publication Status

IATI

Data quality: 100%


Publication Status

IATI

Data quality: 100%


Publication Status

IATI

Data quality: 100%


Publication Status

Always

Format: Document

Source

http://ec.europa.eu/enlargement/pdf/mipd_serbia_2011_2013_en.pdf http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/national_programme_for_serbia_2013.pdf

Comments

Published in the forms of 'Instrument for Pre-accession Assistance (IPA) Multi-annual Indicative Planning Document MIPD 2011-2013 for Serbia and other countries sampled.


Click here to view history

8. Country strategy

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://ec.europa.eu/enlargement/pdf/mipd_serbia_2011_2013_en.pdf
Published in the forms of 'Instrument for Pre-accession Assistance (IPA) Multi-annual Indicative Planning Document MIPD 2011-2013.'

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree
Document
National programme for each IPA component (I, II for Serbia and other for other countries) also exist. E.g. http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/national_programme_for_serbia_2013.pdf together with Expand...project fiches (internationes per sectors or bulk of projects treating same topic/issue).http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm

PWYF Final Assessment
Always
Document
http://ec.europa.eu/enlargement/pdf/mipd_serbia_2011_2013_en.pdf http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/national_programme_for_serbia_2013.pdf Expand...
Published in the forms of 'Instrument for Pre-accession Assistance (IPA) Multi-annual Indicative Planning Document MIPD 2011-2013 for Serbia and other countries Expand...sampled.

Donor Comments
Document
the Indicative Strategy Papers for 2014-2020 will be publicly available (and included into the org. file) after their adoption in September 2014.

Publication Status

IATI

Data quality: 100%


Publication Status
Source

No data available.

Comments

Disaggregated recipient country budgets could not be found for 2014, 2015 and 2016. This information could not be found in ELARG's IATI file in the final pull of IATI data for the Index.


Click here to view history

10. Disaggregated budgets

Stage

Status

Format

Source

Comments

Researcher
Disaggregated recipient country budgets could not be found for 2014, 2015 and 2016.

Donor Review
Disaggregated budget will also be included into the organisation file, wherever available.

PWYF Review
If included in the Organisation file published to the IATI Registry before June 30, this information will be automatically assessed by Expand...the data quality tool of the Tracker.

Independent Reviewer
Disagree
These are currently available only in draft version as in most cases being negotiated vis-a-vis recipient government. It is expected the Expand...first project/sector fiches (country thematic specific plans incl. budgets) would be available/approved towards end of 2014.

PWYF Final Assessment
Disaggregated recipient country budgets could not be found for 2014, 2015 and 2016. This information could not be found in ELARG's Expand...IATI file in the final pull of IATI data for the Index.

Donor Comments
Disaggregated budgets for 2014-2016 are included in the Strategy Papers for 2014 - 2020. They will be provided as soon as Expand...the Papers are adopted (Sept.2014).

Publication Status

IATI

Data quality: 100%


Basic

Classifications

Financial

Performance

12. Implementer

13. Unique ID

14. Title

15. Description

16. Planned Dates

17. Actual Dates

18. Current Status

19. Contact Details

20. Collaboration Type

21. Flow Type

22. Aid Type

23. Finance Type

24. Sector

25. Sub-national Location

26. Tied Aid Status

33. Budget

34. Commitments

35. Disbursements And Expenditure

36. Budget Identifier

37. Results

38. Impact Appraisals

39. Conditions

Publication Status

IATI

Data quality: 100%


Publication Status

IATI

Data quality: 95.24%


Publication Status

IATI

Data quality: 98.74%


Publication Status

IATI

Data quality: 87.55%


Publication Status

IATI

Data quality: 94.41%


Publication Status

IATI

Data quality: 69.1%


Publication Status

IATI

Data quality: 100%


Publication Status

IATI

Data quality: 90.49%


Publication Status

IATI

Data quality: 100%


Publication Status

IATI

Data quality: 100%


Publication Status

IATI

Data quality: 100%


Publication Status

IATI

Data quality: 100%


Publication Status

IATI

Data quality: 100%


Publication Status

Sometimes

Format: Pdf

Source

http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_14_european_integration_and_project_pipeline.pdf

Comments

The text in the sector and project fiches notes that projects are implemented through several activities/contracts. Although some information on sub-national locations is available in sector and project fiches, the information available is not disaggregated per contract. .


Click here to view history

25. Sub-national location

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Pdf
http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_01_public_administration_reform.pdf http://www.europa.rs/en/projects/projektne_aktivnosti.html Expand...
Project activities listed in the EU Delegation in Serbia site do not contain information on sub-national location. Some sub-national location information Expand...available in the national programme document/project fiches, but not consistently. However, it is not possible to use project fiches to score this indicator as ‘always published’ as these documents do not contain the necessary information for each individual activity within a sector of operation or programme component. This is consistent with the scoring approach which has been applied to all other EC departments.

Donor Review
Always
Pdf
http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm
Not available in XML format. However, according to our current publication, the project fiches are the relevant activity level documents which Expand...include the sub-national location. For DG Elarg the ""Project"" is the lower level of activity detail under an objective.

PWYF Review
Sometimes
Pdf
http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_14_european_integration_and_project_pipeline.pdf Expand...
DG ElARG's website includes two types of fiches for Serbia - sector and project fiches. Information published in the sector Expand...fiches is not at the level of each individual project, and therefore cannot be considered as 'always published' for the purposes of the Index which looks for activity-level information. 6 project fiches were available for Serbia at the time of this review. The total amount covered by these project fiches is 63,617,533 while the total assistance provided to Serbia in 2013 was 208,314,227. Project-level information for the difference could not be found. Further, the text included in some of the project fiches (see second link alongside), suggests that mutliple activities are included in a single project fiche. See page 11 which notes ""...Activities 1.1, 1.2 and 3.1 will be implemented through several twinning/twinning light, service contracts and/or framework contracts, as well as grants. "" Information on these contracts and grants is not available in the project fiches.

Independent Reviewer
Disagree
The activity level is project (TA, twinning, grant etc.), so information on from project fiches are not sufficient enough. The Expand...project website/database (http://mapa.euinfo.rs/map/projectdetail/81?project_id=139) has such details, but again it is out of date (last info for 2011). The EUD also has an interactive map of projects (http://www.europa.rs/en/projects/Interactivemap.html?view=fallback) but it does not seem to work.

PWYF Final Assessment
Sometimes
Pdf
http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_14_european_integration_and_project_pipeline.pdf Expand...
The text in the sector and project fiches notes that projects are implemented through several activities/contracts. Although some information on sub-national Expand...locations is available in sector and project fiches, the information available is not disaggregated per contract. .

Donor Comments

Publication Status

IATI

Data quality: 93.75%


Publication Status

Not Published

Source

No data available.

Comments

No data available.


Click here to view history

27. MoU

Stage

Status

Format

Source

Comments

Researcher
Not published
Document
No MoU between EC, ELARG and Serbia or project level agreements could be found.

Donor Review
Not published
Document
Under consideration the possibility to publish Financing agreements at programme level.

PWYF Review
Not published
Document

Independent Reviewer
Disagree
Document
The Financing agreement (as the MoU is called) for IPA Serbia 2013 has juts been signed-a public announcment and breakdown of Expand...the budget from 6th June, 2014 can be found on the EUD website, but no Financial agreement as such: http://www.europa.rs/en/projects/projektne_aktivnosti/4220/Serbia+and+EU+sign+the+IPA+2013+financial+agreement.html

PWYF Final Assessment
Not published
Document

Donor Comments
Document
MoU information will be available when hierarchies are ready for publication.

Publication Status

Always

Format: Document

Source

http://ec.europa.eu/enlargement/news_corner/key-documents/index_en.htm

Comments

The independent reviewer raises an important point about the timeliness of conducting and/or releasing evaluation reports. However, as per the scoring guidelines, evaluations are considered to be 'always published' if they are published within their regular cycles. If information on on-going evaluations is not published when completed, this will be reflected in future years' scores.


Click here to view history

28. Evaluations

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://ec.europa.eu/enlargement/news_corner/key-documents/index_en.htm
Evaluations appear to be consistently published.

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree
Document
The website provides evaluation at the level of IPA instrument or country level (e.g. Serbia-http://ec.europa.eu/enlargement/pdf/financial_assistance/phare/evaluation/2013/23914_rep_serbia.pdf) on a mid-term (3 or more Expand...year) level. In case of Serbia, sector evaluations were also undertaken in the period of 2013 covering IPA financing for 2007-2009. However, project-level evaluations are not standard or part of systematic approach of the EC/DG ENLARG.

PWYF Final Assessment
Always
Document
http://ec.europa.eu/enlargement/news_corner/key-documents/index_en.htm
The independent reviewer raises an important point about the timeliness of conducting and/or releasing evaluation reports. However, as per the scoring Expand...guidelines, evaluations are considered to be 'always published' if they are published within their regular cycles. If information on on-going evaluations is not published when completed, this will be reflected in future years' scores.

Donor Comments
Document

Publication Status

Sometimes

Format: Document

Source

http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_14_european_integration_and_project_pipeline.pdf

Comments

The text in the sector and project fiches notes that projects are implemented through several activities/contracts. Although some information on objectives is available in sector and project fiches, the information available is not disaggregated per contract.


Click here to view history

29. Objectives

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Document
http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/national_programme_for_serbia_2013.pdf http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_01_public_administration_reform.pdf http://www.europa.rs/en/projects/projektne_aktivnosti/3543/Support+to+local+self-governments.html Expand...
Project activities listed in the EU Delegation in Serbia site do not contain information on the objectives of each activity. Some Expand...information on objectives is available in the project fiches/national programme document. However, it is not possible to use ‘project’ fiches to score this indicator as ‘always published’ as these documents do not contain the necessary information for each individual activity within a sector of operation or programme component. This is consistent with the scoring approach which has been applied to all other EC departments

Donor Review
Always
Document
http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm
As the project is for us the lower activity level, project fiches are the relevant documents for the description of the Expand...activity objectives.

PWYF Review
Sometimes
Document
http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_14_european_integration_and_project_pipeline.pdf Expand...
DG ElARG's website includes two types of fiches for Serbia - sector and project fiches. Information published in the sector Expand...fiches is not at the level of each individual project, and therefore cannot be considered as 'always published' for the purposes of the Index which looks for activity-level information. 6 project fiches were available for Serbia at the time of this review. The total amount covered by these project fiches is 63,617,533 while the total assistance provided to Serbia in 2013 was 208,314,227. Project-level information for the difference could not be found. Further, the text included in some of the project fiches (see second link alongside), suggests that mutliple activities are included in a single project fiche. See page 11 which notes ""...Activities 1.1, 1.2 and 3.1 will be implemented through several twinning/twinning light, service contracts and/or framework contracts, as well as grants. "" Information on these contracts and grants is not available in the project fiches.

Independent Reviewer
Disagree
Document
If activity-level is taken at project level, then objectives of each are not published systematically, or only in exception cases via Expand...project brochures etc.

PWYF Final Assessment
Sometimes
Document
http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_14_european_integration_and_project_pipeline.pdf Expand...
The text in the sector and project fiches notes that projects are implemented through several activities/contracts. Although some information on objectives Expand...is available in sector and project fiches, the information available is not disaggregated per contract.

Donor Comments
Document
Sector and project fiches include all relevant general and specific objectives at activity level.

Publication Status

Sometimes

Format: Document

Source

http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_14_european_integration_and_project_pipeline.pdf

Comments

The text in the sector and project fiches notes that projects are implemented through several activities/contracts. Although some budget breakdowns are available in sector and project fiches, the information available is not disaggregated per contract.


Click here to view history

30. Budget Docs

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Document
http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/national_programme_for_serbia_2013.pdf http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_01_public_administration_reform.pdf Expand...
The project activities section in the EU Delegation in Serbia site does not include links to budget documents. Objectives for some Expand...programmes available in the project fiches/national programme document. However, it is not possible to use ‘project’ fiches to score this indicator as ‘always published’ as these documents do not contain the necessary information for each individual activity within a sector of operation or programme component. This is consistent with the scoring approach which has been applied to all other EC departments.

Donor Review
Always
Document
Budget documents are included in the project fiches which correspond to our activity-level information.

PWYF Review
Sometimes
Document
http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_14_european_integration_and_project_pipeline.pdf Expand...
DG ElARG's website includes two types of fiches for Serbia - sector and project fiches. Information published in the sector Expand...fiches is not at the level of each individual project, and therefore cannot be considered as 'always published' for the purposes of the Index which looks for activity-level information. 6 project fiches were available for Serbia at the time of this review. The total amount covered by these project fiches is 63,617,533 while the total assistance provided to Serbia in 2013 was 208,314,227. Project-level information for the difference could not be found. Further, the text included in some of the project fiches (see second link alongside), suggests that mutliple activities are included in a single project fiche. See page 11 which notes ""...Activities 1.1, 1.2 and 3.1 will be implemented through several twinning/twinning light, service contracts and/or framework contracts, as well as grants. "" Information on these contracts and grants is not available in the project fiches.

Independent Reviewer
Disagree
Document
EUD has a list (Excel-http://www.europa.rs/en/kakoDoFondova/dodeljeni-ugovori.html) with contract in budgets, but it is out of date (last update 1 August 2011-the same Expand...status as last year). The project website/database (http://mapa.euinfo.rs/map/projectdetail/81?project_id=139) included budgetary information, but it is also out of date (last info for 2011).

PWYF Final Assessment
Sometimes
Document
http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_14_european_integration_and_project_pipeline.pdf Expand...
The text in the sector and project fiches notes that projects are implemented through several activities/contracts. Although some budget breakdowns are Expand...available in sector and project fiches, the information available is not disaggregated per contract.

Donor Comments
Document
Budget documents are included in sector/project fiches, not in contracts.

Publication Status

Always

Format: Document

Source

http://ec.europa.eu/budget/fts/index_en.htm http://ec.europa.eu/enlargement/tenders/list-contractors/index_en.htm

Comments

The information was available via the FTS site at the time of conducting this final review.


Click here to view history

31. Contracts

Stage

Status

Format

Source

Comments

Researcher
Not published
Document
http://ec.europa.eu/budget/fts/index_en.htm http://ec.europa.eu/enlargement/tenders/list-contractors/index_en.htm
In 2013, contracts were available through the FTS website. However, no contracts awarded in 2013 or 2014 were available on the Expand...website at the time of data collection. Summary information of contracts awarded in 2013 was also not found. EC, ELARG to clarify if these are published elsewhere.

Donor Review
Always
Document
http://ec.europa.eu/budget/fts/faq_en.htm#faq2
FTS data for 2013 will be published in June 2014, as stated on the FAQ page of the FTS website http://ec.europa.eu/budget/fts/faq_en.htm#faq2 Expand...

PWYF Review
Not published
Document
If this information is available before the end of data collection (June 30), it will be taken into account for the Index.

Independent Reviewer
Disagree
Document
The list of contracts at DG ENLARG website mostly includes contractors hired at the institutional level. Contracts for IPA funded activities Expand...in Serbia are published at the EUD Serbia website, but the list is out of date (last update 1 August, 2011) and in Excel format-http://www.europa.rs/en/kakoDoFondova/dodeljeni-ugovori.html

PWYF Final Assessment
Always
Document
http://ec.europa.eu/budget/fts/index_en.htm http://ec.europa.eu/enlargement/tenders/list-contractors/index_en.htm
The information was available via the FTS site at the time of conducting this final review.

Donor Comments
Document

Publication Status

Always

Format: Document

Source

https://webgate.ec.europa.eu/europeaid/online-services/index.cfm?ADSSChck=1397484299963&do=publi.welcome&searchtype=QS&nbPubliList=50&orderby=ctr&orderbyad=Asc

Comments

Published through the Europeaid website.


Click here to view history

32. Tenders

Stage

Status

Format

Source

Comments

Researcher
Always
Document
https://webgate.ec.europa.eu/europeaid/online-services/index.cfm?ADSSChck=1397484299963&do=publi.welcome&searchtype=QS&nbPubliList=50&orderby=ctr&orderbyad=Asc
Published through the Europeaid website.

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree
Document

PWYF Final Assessment
Always
Document
https://webgate.ec.europa.eu/europeaid/online-services/index.cfm?ADSSChck=1397484299963&do=publi.welcome&searchtype=QS&nbPubliList=50&orderby=ctr&orderbyad=Asc
Published through the Europeaid website.

Donor Comments
Document

Publication Status

Not Published

Source

No data available.

Comments

No forward-looking activity budget information could be found. Other EC agencies publish this information in their IATI files.


Click here to view history

33. Budget

Stage

Status

Format

Source

Comments

Researcher
Not published
No forward-looking activity budget information could be found.

Donor Review
Not published

PWYF Review
Not published

Independent Reviewer
Disagree
The assessment is correct, but it should be taken into consideration and cross-checked with other EC departments assessed as 2014 is Expand...start of the new financing cycle, including IPA so it is not possible to have budgetary information beyond yearly (2014-2020) and country (Serbia) information.

PWYF Final Assessment
Not published
No forward-looking activity budget information could be found. Other EC agencies publish this information in their IATI files.

Donor Comments
This information is not present as ELARG does publish at project level. It will be available once hierarchies will be ready Expand...for publication.

Publication Status

IATI

Data quality: 100%


Publication Status

IATI

Data quality: 74.3%


Publication Status

Not Published

Source

No data available.

Comments

This information could not be found.


Click here to view history

36. Budget Identifier

Stage

Status

Format

Source

Comments

Researcher
Not published
This information could not be found.

Donor Review
Not published

PWYF Review
Not published

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
This information could not be found.

Donor Comments

Publication Status

Sometimes

Format: Pdf

Source

http://ec.europa.eu/enlargement/news_corner/key-documents/index_en.htm http://ec.europa.eu/enlargement/pdf/case-studies/2013/130604_serbia_successstories_1_en.pdf

Comments

Very brief results information available in case study documents. Some results information also available in evaluations. However results information could not be found consistently for all projects.


Click here to view history

37. Results

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Pdf
http://ec.europa.eu/enlargement/news_corner/key-documents/index_en.htm http://ec.europa.eu/enlargement/pdf/case-studies/2013/130604_serbia_successstories_1_en.pdf Expand...
Very brief results information available in case study documents. Some results information also available in evaluations. However results information could not Expand...be found consistently for all projects.

Donor Review
Sometimes
Pdf

PWYF Review
Sometimes
Pdf

Independent Reviewer
Disagree
EUD and Serbia government conducted mid-term sector (not project) evaluations in course of 2013 for IPA I which to some extent Expand...tried elaborating results of projects on sector level.http://www.evropa.gov.rs/Evropa/PublicSite/Documents.aspx

PWYF Final Assessment
Sometimes
Pdf
http://ec.europa.eu/enlargement/news_corner/key-documents/index_en.htm http://ec.europa.eu/enlargement/pdf/case-studies/2013/130604_serbia_successstories_1_en.pdf Expand...
Very brief results information available in case study documents. Some results information also available in evaluations. However results information could not Expand...be found consistently for all projects.

Donor Comments
The EC does not have results-related documents that could be published for this purpose. The situation might change with the new Expand...results framework to be defined under IPA II.

Publication Status

Sometimes

Format: Document

Source

http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_14_european_integration_and_project_pipeline.pdf

Comments

The text in the sector and project fiches notes that projects are implemented through several activities/contracts. Although some information on pre-project impact appraisals is available in the sector and project fiches, the information available is not disaggregated per contract.


Click here to view history

38. Impact Appraisals

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Document
http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/national_programme_for_serbia_2013.pdf http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_01_public_administration_reform.pdf Expand...
The project activities section in the EU Delegation in Serbia site does not include information relating to impact appraisals. Impact assessments Expand...are sometimes available in the project fiches/national programme document. However, it is not possible to use ‘project’ fiches to score this indicator as ‘always published’ as these documents do not contain the necessary information for each individual activity within a sector of operation or programme component. This is consistent with the scoring approach which has been applied to all other EC departments.

Donor Review
Always
Document
http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm
The only information related to impact appraisals is available in the single project documents published on DG ELARG website.

PWYF Review
Sometimes
Document
http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_14_european_integration_and_project_pipeline.pdf Expand...
DG ElARG's website includes two types of fiches for Serbia - sector and project fiches. Information published in the sector Expand...fiches is not at the level of each individual project, and therefore cannot be considered as 'always published' for the purposes of the Index which looks for activity-level information. 6 project fiches were available for Serbia at the time of this review. The total amount covered by these project fiches is 63,617,533 while the total assistance provided to Serbia in 2013 was 208,314,227. Project-level information for the difference could not be found. Further, the text included in some of the project fiches (see second link alongside), suggests that mutliple activities are included in a single project fiche. See page 11 which notes ""...Activities 1.1, 1.2 and 3.1 will be implemented through several twinning/twinning light, service contracts and/or framework contracts, as well as grants. "" Information on these contracts and grants is not available in the project fiches.

Independent Reviewer
Disagree
Document
Sector evaluations (http://www.evropa.gov.rs/Evropa/PublicSite/Documents.aspx) can be taken as type of impact appraisals as conducted in 2013 to asses project impacts per sector Expand...of IPA I as a basis for sector support under IPA II.

PWYF Final Assessment
Sometimes
Document
http://ec.europa.eu/enlargement/instruments/funding-by-country/serbia/index_en.htm http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/pf_14_european_integration_and_project_pipeline.pdf Expand...
The text in the sector and project fiches notes that projects are implemented through several activities/contracts. Although some information on pre-project Expand...impact appraisals is available in the sector and project fiches, the information available is not disaggregated per contract.

Donor Comments
Document
The only information related to impact appraisals is available in the single project / sector documents published on DG ELARG website.

Publication Status

Not Published

Source

No data available.

Comments

This information needs to be available on a per activity basis in order to score 'always published.' This information could not be found in the financing decisions documents.


Click here to view history

39. Conditions

Stage

Status

Format

Source

Comments

Researcher
Not published
Document
This information could not be found. In order to score on this indicator conditions need to be explicitly stated per Expand...activity or made clear that they cover all activities and no additional conditions apply to specific activities.

Donor Review
Not published
Document
example http://ec.europa.eu/enlargement/pdf/serbia/ipa/2013/national_programme_for_serbia_2013.pdf
Financing decisions include conditions for the activity implementation and are published on ELARG website.

PWYF Review
Not published
Document
This information needs to be available on a per activity basis in order to score 'always published.'

Independent Reviewer
Disagree
Document
Such information could be could be found in the text of the project contract which are not publicly available for IPA Expand...funds.

PWYF Final Assessment
Not published
Document
This information needs to be available on a per activity basis in order to score 'always published.' This information could not Expand...be found in the financing decisions documents.

Donor Comments
Document